•
Extend the server from the rack.
•
Remove the server from the rack.
4.
Remove the access panel.
5.
Do one of the following:
•
Remove the air baffle.
•
If installed on LFF models, remove the midplane drive cage.
6.
Install the Smart Storage battery.
7.
Install the cable.
8.
Install the fan cage.
9.
Install the air baffle.
Hardware options installation
69