START OVER TILE
The startover
tile is used to restart the job from the beginning. The STARTOVER tile is
only used from within an IF/DO or
a STARTOVER tile at the end of the job. OB7 will automatically start over at the end of the job
(according to the setting in the
OB7 Collaborative Robot User Manual
OB7 Control Functions / 108
IF/ELSE/DO portion of the job. It is not necessary to use
ART tile).
Version 0.6