Fayat Group Dynapac SD2500C Operation & Maintenance Manual page 345

Paver finisher
Table of Contents

Advertisement

When work is finished
- Run the paver finisher empty and stop it.
- Lift the screed using switch (69), set the crossbeam lock (75).
- Retract the screed parts to the basic screed width and lift the auger. Where appli-
cable, completely extend the levelling cylinders.
- Close hopper halves, set hopper transport safeguards.
The screed is hydraulically secured in the lifted position.
A
- While operating the tampers at a low speed, let any material residues drop out.
- Set the drive lever (13) to the centre position and the speed adjuster (15) to minimum.
- Switch the screed heater system off.
- Switch off the ignition (11).
- With a screed with gas heating system (o), close the main shut-off valves and the
bottle valves.
- Remove the levelling units and stow them away in the boxes, close all flaps.
- Remove all parts that extend beyond the paver finisher contour or secure them
if the paver finisher is to be transported over public roads on a low-bed trailer.
- Read and check the operating hour meter to determine whether maintenance work
must be performed (see chapter F).
- Cover and lock the operating panel.
- Remove material residues from the screed and the paver finisher and spray all
parts with separator fluid.
NOTE
Caution! Possible damage to the engine electronics
- After the drive engine is switched off, the on-board
voltage may not be switched off until after
a period > 100 seconds (main switch).
Always observe the operating instructions!
D 41 37