Commissioning Checklist - Siemens SICHARGE UC 150 Operating Instructions Manual

Hide thumbs Also See for SICHARGE UC 150:
Table of Contents

Advertisement

4. Make sure that the charging station is in "Current demand" mode.
– "Charging" HMI display.
– Current ramps up to meet the demand of the vehicle.
5. End the session using the dedicated stop button on the HMI.
– Charging process stops.
– Charge stopped is displayed on the HMI.
NOTE
The charging station response of 100 % depends on the request from the vehicle.
• If the vehicle requests the charging process to stop at 100 %, the charging station stops.
• If the vehicle request does not stop the charging process at 100 %, the charging station
will continue with the process. The customer then has to stop the process.
8.2

Commissioning checklist

The checklist for commissioning is available on the Internet here: Installation and Commis­
sioning Checklist (https://support.industry.siemens.com/cs/ww/en/109815372)
SICHARGE UC 150
Operating Instructions, 02/2023, A5E50068475-AB
Commissioning
8.2 Commissioning checklist
111

Advertisement

Table of Contents
loading

Table of Contents