Installation
6.7 Installation checklist
Install the cable gland plate
1. Push the cable gland plate onto the fastening screws in the cabinet floor.
2. Screw the nuts onto the fastening screws.
3. Tighten all nuts.
4. Tighten all cable glands.
NOTE
Seal the cable openings with permissible sealing material. Permissible sealing material
includes silicone and soft PU foam.
6.6
Re-attaching protective cover
Once you have finished working on the connections of the charging station, you must
reassemble the protective cover for the interior.
Mounting the protective cover
To fit the protective cover, proceed as follows:
1. Position the protective cover.
2. Tighten the fastening screws of the protective cover.
6.7
Installation checklist
The checklist for installation is available on the Internet here: Installation and Commissioning
Checklist (https://support.industry.siemens.com/cs/ww/en/109815372)