Shutdown - Graco Reactor 2 E-30 Operation

Proportioning systems
Hide thumbs Also See for Reactor 2 E-30:
Table of Contents

Advertisement

Spraying

Shutdown

Shutdown
Shutdown
NOTICE
NOTICE
NOTICE
Proper system setup, startup, and shutdown
procedures are critical to electrical equipment
reliability. The following procedures ensure
steady voltage. Failure to follow these
procedures will cause voltage fluctuations that
can damage electrical equipment and void the
warranty.
1. Press
to stop the pumps.
2. Turn off all heat zones.
3. Relieve pressure.
Pressure Relief Procedure, page
4. Press
to park the Component A Pump.
The park operation is complete when green
dot goes out. Verify the park operation is
complete before moving to next step.
5. Press
to deactivate the system.
58
See
62.
6. Turn off the air compressor, air dryer, and
breathing air.
7. Turn main power switch OFF.
To prevent electric shock do not remove
any covers or open the electrical enclosure
door while the power is ON.
8. Close all fluid supply valves.
333023U

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reactor e-xp2

Table of Contents