Connect Power - Graco Reactor 2 E-30 Operation

Proportioning systems
Hide thumbs Also See for Reactor 2 E-30:
Table of Contents

Advertisement

Connect

Connect Power

Connect
Power
Power
All electrical wiring must be done by a
qualified electrician and comply with all local
codes and regulations.
1. Turn main power switch (MP) OFF.
2. Open electrical enclosure door.
NOTE: Terminal jumpers are located inside
NOTE:
NOTE:
the electrical enclosure door.
NOTE: 350–415 VAC systems are not designed
NOTE:
NOTE:
to operate from 480 VAC power source.
333023U
3. Install supplied terminal jumpers in the
positions shown in image for the power
source used.
4. Route power cable through strain relief (EC)
in electrical enclosure.
5. Connect incoming power wires as shown
in image. Gently pull on all connections to
verify they are properly secured.
6. Verify all items are connected properly
as shown in image then close electrical
enclosure door.
See
Models
for Reactor power requirements.
Setup
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reactor e-xp2

Table of Contents