Startup

Startup
Startup
To prevent serious injury, only operate Reactor
with all covers and shrouds in place.
NOTICE
NOTICE
NOTICE
Proper system setup, startup, and shutdown
procedures are critical to electrical equipment
reliability. The following procedures ensure
steady voltage. Failure to follow these
procedures will cause voltage fluctuations that
can damage electrical equipment and void the
warranty.
1. Check fluid inlet filter screens.
Before daily startup, ensure that the
fluid inlet screens are clean. See
Flush Inlet Strainer Screen, page 65
2. Check ISO lubrication reservoir.
Check level and condition of ISO lube daily.
See
Pump Lubrication System, page
3. Use A and B Drum Level Sticks (24M174)
to measure the material level in each
drum.. If desired, the level can be
entered and tracked in the ADM. See
Advanced Setup Screens, page
333023U
4. Check generator fuel level.
5. Confirm main power switch is OFF before
starting generator.
6. Ensure the main breaker on the generator
is in the off position.
7. Start the generator. Allow it to reach full
operating temperature.
8. Turn main power switch ON.
The ADM will display the following screen
until communication and initialization is
complete.
66.
35.
NOTICE
NOTICE
NOTICE
Running out of fuel will cause voltage
fluctuations that can damage electrical
equipment and void the warranty. Do not
run out of fuel.
Startup