Validation on demand
To check the validity of an application configuration, click the 'Validate Configuration' icon in the
toolbar. ACT will check the application configuration for formal correctness. Found problems are
qualified in:
Warnings, marked by a yellow warning icon
Errors, marked by a red circle with a cross
Warnings will not prevent writing to the IED. Errors have to be corrected before writing the
application configuration to the IED. An application configuration can be saved and ACT can be
closed with open errors, but not written to the IED, see
These problems are listed in the
click in the error or warning row will navigate to the MainApplication>Page>Area where the
problems are identified.
IEC09000614 V2 EN-US
Figure 38: ACT: Validation on demand
Validation when writing to the IED
When writing the application configuration to the IED an automatic validation is performed. The
validation is the same as the manually demanded validation. Errors will abort the writing.
650 series
Engineering manual
Example: A variable connected to an output signal that is not connected.
Example: If the user connects output from higher execution order function to inputs of
lower execution order function.
Example: A mandatory input signal that is not connected.
Output View under the Tab Application Configuration . A double-
© Copyright 2011 ABB. All rights reserved
Protection and control engineering
Figure
38.
IEC09000614_2_en.vsd
Section 5
53

Advertisement

Table of Contents
loading

Table of Contents