Engineering Process; Workflow - ABB Relion 650 Series Engineering Manual

Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

1MRK 511 245-UUS A
Section 3
3.1

Workflow

Save the work
between the
different steps
Signal engineering
Write configuration
IEC08000122 V1 EN-US
Figure 4:
The described sequence in
of the steps. It is possible to do a different sequence based on the available information at the
time the project is started. This means that several iterations may be needed to finish the project.
650 series
Engineering manual

Engineering process

Start
Project
HWT
ACT/
SMT
PST
GDE
Supported
protocols
CMT
to IED
IED
WRITE
End
IED engineering workflow
Figure 4
© Copyright 2011 ABB. All rights reserved
Create plant structure
Optional, can be used to add
additional hardware modules
Configure IED functionality
Parametrization
Create Single line diagram
for local HMI
IEC61850
Export SCL files from
Export
PCM600
SCD
Import SCL files to CCT600
and do signal engineering.
CCT600
Export SCL files from
CCT600.
Import
Import SCL files to PCM600
SCD
Make GOOSE connections
SMT
Write configuration
IED
to IED
WRITE
End
IEC08000122.vsd
is a proposal based on practical experience and dependencies
Section 3
Engineering process
SEMOD58465-5 v4
19