ABB Relion 650 Series Engineering Manual
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

Quick Links

®
Relion
650 SERIES
650 series
Version 1.3 IEC
Engineering manual

Advertisement

Table of Contents
loading

Summary of Contents for ABB Relion 650 Series

  • Page 1 ® Relion 650 SERIES 650 series Version 1.3 IEC Engineering manual...
  • Page 3 Document ID: 1MRK 511 284-UEN Issued: November 2019 Revision: B Product version: 1.3 © Copyright 2013 ABB. All rights reserved...
  • Page 4 Copyright This document and parts thereof must not be reproduced or copied without written permission from ABB, and the contents thereof must not be imparted to a third party, nor used for any unauthorized purpose. The software and hardware described in this document is furnished under a license and may be used or disclosed only in accordance with the terms of such license.
  • Page 5 This document has been carefully checked by ABB but deviations cannot be completely ruled out. In case any errors are detected, the reader is kindly requested to notify the manufacturer.
  • Page 6 (Low-voltage directive 2006/95/EC). This conformity is the result of tests conducted by ABB in accordance with the product standards EN 50263 and EN 60255-26 for the EMC directive, and with the product standards EN 60255-1 and EN 60255-27 for the low voltage directive.
  • Page 7: Table Of Contents

    Function block execution parameters................. 44 5.1.5 Configuration parameters..................... 46 5.1.6 Connections and variables.....................46 5.1.7 Hardware channels........................47 5.1.8 Validation...........................48 Setting configuration and setting parameters in PST............49 Connecting signals in SMT....................... 50 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 8 Selecting to communicate DNP3 data via RS485 serial interface on COM03 or COM05 module......................... 96 9.4.2.1 RS485 specific parameters....................96 9.4.3 Selecting to communicate DNP3 data via optical serial interface on COM03 or COM05 module......................... 96 Section 10 Glossary......................97 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 9: Introduction

    IEDs. The installation and commissioning personnel must have a basic knowledge of handling electronic equipment. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 10: Product Documentation

    The manual provides instructions for the monitoring, controlling and setting of the IED. The manual also describes how to identify disturbances and how to view calculated and measured power grid data to determine the cause of a fault. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 11: Document Revision History

    The caution icon indicates important information or warning related to the concept discussed in the text. It might indicate the presence of a hazard which could result in corruption of software or damage to equipment or property. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 12: Document Conventions

    Generator differential protection REFPDIF Restricted earth fault protection, low impedance HZPDIF 1Ph High impedance differential protection Impedance protection ZQMPDIS Five-zone distance protection, Quadrilateral and Mho characteristic Table continues on next page 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 13 Negative-sequence time overcurrent protection for machines VRPVOC Voltage-restrained time overcurrent protection Voltage protection UV2PTUV Two-step undervoltage protection OV2PTOV Two-step overvoltage protection ROV2PTOV Two-step residual overvoltage protection Table continues on next page 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 14 Interlocking for double CB bay DB_BUS_B Interlocking for double CB bay DB_LINE Interlocking for double CB bay ABC_LINE Interlocking for line bay AB_TRAFO Interlocking for transformer bay Table continues on next page 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 15 TIMERSETQT Configurable logic Q/T, settable timer PULSETIMERQT Configurable logic Q/T, pulse timer INVALIDQT Configurable logic Q/T, INVALIDQT INDCOMBSPQT Configurable logic Q/T, single-indication signal combining Table continues on next page 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 16 IED status for IEC 60870-5-103 I103SUPERV Supervision status for IEC 60870-5-103 I103USRDEF Status for user defiend signals for IEC 60870-5-103 Metering PCGGIO Pulse counter logic ETPMMTR Function for energy calculation and demand handling 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 17 Denial of service, frame rate control for front port DOSLAN1 Denial of service, frame rate control for LAN1 port SECALARM Component for mapping security events on protocols such as DNP3 and IEC103 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 19: Engineering Tool Set

    PCM600 to station engineering tools for engineering of station communication between bay IEDs and station IEDs. A PC with PCM600 can be connected to any 650 series IED within a station using the Ethernet connection. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 20: Ied Engineering Process

    Communication engineering • IEC 61850 station communication engineering can be done in two ways, with a separate tool, IET600 or with the PCM600 built in IEC 61850 configuration tool. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 21 Engineering tool set PCM600 interacts with IET600 by importing and exporting SCL files. The built in tool can be used for small projects (about 10 IEDs) including ABB IEDs only. • Organizing GOOSE messages received and managing the used IO signal is done by using the Signal Matrix tool.
  • Page 22 IED for various purposes. The connection between the physical IED and PCM600 is established via an Ethernet link on the front or rear port on the IED. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 23: Engineering Process

    This means that several iterations may be needed to finish the project. • Setting up the PCM600 project • Build the plant structure according to the substation structure. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 24 The IED will reboot at the next PCM600 to IED write operation only in case there are errors while configuring the IEC61850 protocol at the most recent attempt. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 25: Setting Up A Project

    The technical key property in PCM600 corresponds to the IED name attribute in SCL files. Avoid changing the IED name attribute outside PCM600, because data in PCM600 might be lost when importing SCL files. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 26 The technical key for an IED object in PCM600 can also be changed in the Object properties window. IED in the Plant Structure . Select the Set Technical Key , see Right-click and select Figure 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 27 IED object in PCM600 or • set a user defined technical key, which changes the technical key for both the physical IED and IED object in PCM600. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 28: Setting Up Communication Between Pcm600 And The Ied

    Tx with Rx on the other side and vice versa. These cables are known as cross over cables. The maximum length is 2 m. The connector type is RJ-45. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 29 DHCPServer, the IEDs DHCP server for the front port assigns an IP address for the PC. The PC must be configured to obtain its IP address automatically as described in the following procedure. Select Search programs and files in the Start menu in Windows. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 30 1MRK 511 284-UEN B Setting up a project IEC13000057-1-en.vsd IEC13000057 V1 EN-US Figure 9: Select: Search programs and files Type View network connections and click on the View network connections icon. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 31 IEC13000059-1-en.vsd IEC13000059 V1 EN-US Figure 11: Right-click Local Area Connection and select Properties Select the TCP/IPv4 protocol from the list of configured components using this connection and click Properties. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 32 IP address is not set to be obtained automatically by the IED, see port is used and if the Figure 14. The IP address must be different from the IP address chosen for the IED. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 33: Project Managing In Pcm600

    Extensions of the exported project file is *.pcmp and those files are only used for exporting and importing the projects between PCM600s. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 34: Building A Plant Structure

    Bay = Bay within the voltage level IED = selection of the IED, which is used in the bay. Several IEDs are possible within a bay, for example one control IED and two protection IEDs. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 35: Iec 61850 Naming Conventions To Identify An Ied

    61346 and the extended definitions done for substations by a technical committee. The Object Properties under SCL Technical Key or Technical Key . technical key is shown in the 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 36: Inserting An Ied

    The context menu or the Object Types view shows the available 650 series IEDs possible to insert, on the bay level in the plant structure, according to the installed connectivity package. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 37 It is also possible to drag an IED from the Object Types window to the Bay level. Online Configuration mode, see Select the Figure IEC09000660-1-en.vsd IEC09000660 V1 EN-US Figure 18: PCM600: Configuration mode selection wizard Select the IED Communication protocol, see Figure 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 38 PCM600, see Figure. The user can not scan data from the IED or proceed further if the IED is not online or if the IP address is not correct. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 39 IED Type , IED Version and IP Address of IED Cancel the insertion or confirm the configuration and do the Figure 23. It is possible to Finish insertion with 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 40 24. The order specific file is delivered in a order confirmation E-mail. If no order specific file is available then select the No Order Specific File option, see Figure 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 41 1MRK 511 284-UEN B Section 4 Setting up a project IEC09000665 V4 EN-US Figure 24: PCM600: IED Version selection 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 42 In hardware tool it is possible to change the hardware configuration of the IED after it is inserted, for example if wrong selections were made in off line mode when no license file was used. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 43 Procedure to insert a template IED Bay in the plant structure. Right-click the New and Create from Template ... to open the Create New Object from Template Select window, see Figure 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 44 Configured IEDs in 650 series in PCM600 are available as *.pcmi files and include all information that is related to the IED object in PCM600. The configured IEDs in 650 series is 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 45: Setting Ied Ip Address In The Project

    PCM600 but only from LHMI. • Via the first window of the wizard when including a new IED in a project, see Figure 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 46 Open the IP address row and enter the IP address. Place the cursor in the The used alternative depends on the time at which the IP address is available. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 47: Protection And Control Engineering

    SMT, they will not be shown in SMT. • Document the application configuration, for example to make printouts. • Test the application configuration online. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 48: Function Blocks

    • Invert Boolean inputs and Boolean outputs. Mandatory signals must be connected. Function blocks with disconnected outputs are not executing and hence may show improper values on the outputs. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 49: Signals And Signal Management

    Boolean input and output signals may need to be inverted to fulfill the logic. ACT supports to add the inversion logic to a binary signal. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 50: Function Block Execution Parameters

    Analogue data driven applications require sample values from Analogue input modules - in case the physical module is broken, applications are not executed. Time driven applications are executed periodically regardless of the status of the analogue signal processing. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 51 Cycle Time can be selected to 5, 20 or 100 ms. Depending on function block type and the 650 series product only one, two or all three possibilities may be available. Execution Order , Instance Number is predefined by ABB. Mainly for basic The combination...
  • Page 52: Configuration Parameters

    It is possible to search and replace variable names in ACT. Connection validation A connection is only useful and possible between two signals of the same data type, see Figure 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 53: Hardware Channels

    That prevents for using a hardware binary output channel twice. As an example, see Figure 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 54: Validation

    To check the validity of an application configuration, click the 'Validate Configuration' icon in the toolbar. ACT will check the application configuration for formal correctness. Found problems are qualified in: • Warnings, marked by a yellow warning icon 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 55: Setting Configuration And Setting Parameters In Pst

    Note that the some parameters are only visible in PST and some are only visible on LHMI. A common write from PCM600 to the IED, where parameters are changed in PST, will overwrite any parameter changes made locally from LHMI. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 56: Connecting Signals In Smt

    IED. Connecting signals in SMT GUID-B413A348-61AA-482E-AA4A-E351D3B2ED8F v3 SMT is used to do cross references, see Figure • between physical IO signals and function blocks. • for the GOOSE engineering. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 57 Connections made in SMT are automatically shown in ACT. Connections made in ACT are automatically shown in SMT. It is possible to group and collapse hardware channels in SMT to get a better overview. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 58 Depending on the IED capability, SMT has a separate sheet for each possible combination. The possible sheets are: • Binary Inputs • Binary Outputs • Analog Inputs • GOOSE Receive 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 59: Local Hmi Engineering

    The operation mode of the function keys and the LEDs is defined in Parameter Setting tool. • The presented text labels on the LCD for LHMI keys and LEDs. • Graphical Display Editor with assistance of Application Configuration tool, for example 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 60 Generates a pulse whenever a new LED signal occurs. It may be used to trigger an acoustical alarm. tReset and tMax for the LED operation mode 'LatchedReset-S'. • Handles the timer Function block GRP1_LED1 to GRP3_LED15 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 61 The default position after power up or reset is OFF. • Menu shortcut • When pressing a key configured for that purpose, the function key panel is hidden and LHMI opens directly in the configured menu. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 62 The LED stays in steady mode when it is reset and the signal is still in ON state. • The LED is OFF only after the signal has changed to OFF state AND it is reset by the operator via 'Clear' operation. • LatchedReset-S 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 63: Led Operation Modes

    Monitoring a signal with a LED is a simple mode, where the LED follows the signal state. More than one signal per LED can be used when applicable. See Figure 46 for the valid priority rules. The LED illuminates always in steady state. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 64 OFF (at least for this color). • The signal is already gone when acknowledged, the LED turns ON , the LED stays illuminated and changes to steady state. • The signal is still 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 65 This operation mode operates exactly as the one described above (LatchedAck-F-S). The only difference is that the illumination mode is changed. Flash mode instead of steady mode and steady mode instead of flash mode. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 66 ON at the end of tReset will return to ON with the next application configuration cycle after tReset. To clear these LEDs, a second timer tMax is used. TMax is 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 67: Single-Line Diagram Engineering

    Concept description to present and generate diagrams in graphical display editor GUID-3C532F5A-3E26-4A3A-ACE3-C7758494BE4D v6 Additional concept information to use GDE, see Figure • Different GDE windows • HMI display raster layouts • Drawing lines (doing a Link) 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 68 All symbol objects, for example apparatus, text and measurement, on the HMI page must be linked to the correct function block in the application configuration in order to present the correct process values. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 69 • UniCode characters (13 x 14 pixel) The total size of the presented white area (page) represents the visible part of the local HMI display without header and foot-line. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 70: Supported Single-Line Diagram Symbols

    Draw all line elements that are necessary. Select in the menu bar to finish the line drawing. Click IEC05000598-2-en.vsd IEC05000598 V2 EN-US Figure 56: GDE: Drawing a line 6.2.2 Supported single-line diagram symbols GUID-AA86E5A0-4060-436A-93A9-D5901F91BD09 v3 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 71 IEEE 315 Type Symbol Definitions Connections Junction Connections Busbar junction Connections Earth Connections Feeder end Measuring Current transformer transformers Measuring Voltage transf. 2 windings transformers Table continues on next page 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 72 T2WPDIF T3WPDIF MVGGIO SPVNZBAT SESRSYN LCPTTR LFPTTR LMBRFLO OEXPVPH L4UFCNT SXSWI CVMMXN TEIGGIO SXCBR ETPMMTR Others Capacitor Others Surge arrestor Others Generator Others Reactor Table continues on next page 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 73 00 = Middle position DPGGIO, SXSWI Isolator indication only, 01 = Open Isolator indication only, 10 = Closed Isolator indication only, 11 = Undefined Table continues on next page 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 74 Isolator2 indication only, 11 = Undefined Switchgear Breaker2, 00 = Middle SCSWI position Breaker2, 01 = Open Breaker2, 10 = Closed Breaker2, 11 = Undefined Table continues on next page 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 75 SLGGIO Texts Selector switch, 00 = SLGGIO Middle position Selector switch, 01 = Open Selector switch, 10 = Closed Selector switch, 11 = Undefined Table continues on next page 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 76: Bay Configuration Engineering

    11. Save the complete picture. 12. Repeat the steps for all pages when more than one is needed. 13. Write the display configuration to IED from the GDE tool. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 77 Select Input Signal . A list of the Right-click the measurement symbol and select engineered measurement application function blocks opens. Select the measurement application function block that corresponds to the selected symbol. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 78 Factor in the object properties (see Figure 60) to display values in more readable units (for example MW). Be sure to write the proper unit under the Unit Text field. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 79: Events And Indications

    To get IED events to the LHMI event list and indications for LEDs, disturbance report needs to be engineered. Detailed information about disturbance report subfunctions is found in the technical manual. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 81: Iec 61850 Communication Engineering

    IEC 61850. 7.1.2 IEC 61850 interface in IED SEMOD58549-61 v3 Figure 61 for a principle view of the IEC 61850 logical node concept in the IED. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 82: Goose Data Exchange

    Ethernet. Whoever needs the information detects the telegram by its source address and will read the telegram and deals with it. The telegrams are multicast sent and not acknowledged by the receiver. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 83: Station Configuration Description File Types

    Capability description of the IED in logical nodes and their data. No information about communication configuration, for example, is included. • An IED is already extended by default data sets. They are predefined by ABB. Changes or additional data sets, for example, have to be done with the IET600 station configuration tool.
  • Page 84: Iec 61850 Engineering Procedure

    Configure horizontal and vertical communication in the IET600 station configuration tool. Import SCL files to PCM600 project. In the scenario in Figure 63 it is the updated SCD file. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 85: Exporting Scl Files From Pcm600

    IED, that is to set the IEC61850-8-1 Operation On . setting to 7.3.1 Exporting SCD files GUID-2FDA859B-3761-4310-BEFF-11BB046A406B v1 Procedure to export the SCD file from PCM600: Select the station in the plant structure, see Figure 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 86: Exporting Icd Or Cid Files

    Export Private Sections , Export As SCL Template or Include Goose Sending IEDs and Select Export , see SCL Export Options window according click Figure 67. Note that the options in Figure 67 is only available when an ICD file is exported. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 87: Engineering Of Vertical And Horizontal Communication In Iet600

    IED client and configure them to the subnetwork before connecting report control blocks to the clients. Create a GOOSE message data set for the sending IED. Define the content of the data set according to the requirements. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 88: Importing Scl Files To Pcm600

    SCL Import Options window opens, which queries how the file should be handled during import, see Figure IEC09000631-1-en.vsd IEC09000631 V1 EN-US Figure 68: IEC 61850: Import SCD file 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 89 SCD file, disregarding if the IED type(s) in the SCD file matches the IED object(s) in PM600 or not. (Can be used when third party IED's are included in the SCD-file. For example sending GOOSE messages to ABB IED's included in the current project.) Import when the file definition has been completed.
  • Page 90: Importing Icd Or Cid Files

    SCD file, disregarding if the IED type(s) in the SCD file matches the IED object(s) in PM600 or not. Import when the definition has been completed. A progress window presents 3.5. Start the import procedure. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 91: Writing Communication Configuration To Ied

    If no changes have been done in the communication configuration part, click No in the Update Communication window. IEC09000729-1-en.vsd IEC09000729 V1 EN-US Figure 71: Update the communication configuration in the IED with the configuration made in PCM600 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 93: Iec 60870-5-103 Communication Engineering

    OPTICAL103 function under Main menu/Configuration/Communication/Station communication/IEC60870-5-103/OPTICAL103:1 in local HMI. The general communication settings for IEC 60870-5-103 serial communication for RS485 is found in RS485103 function under Main menu/Configuration/Communication/Station communication/IEC60870-5-103/RS485103:1 in local HMI. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 94 MMXU measurement function blocks. See I103MEAS function block for more information. EventRepMode : Defines the mode for how events are reported. The event buffer size is • 1000 events. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 95: Dnp3 Communication Engineering

    Configure ACTVGRP (Basic IED functions) and SP16GGIO (Monitoring) with the Application Configuration Tool (ACT). 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 96 Signal Type to Binary Input Open the Communication Management Tool (CMT). Set the Object and choose the connection of the master for which the values should be presented. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 97 Select the signals and move them into the DNP signal list of the master. DNP point zero and one of the Binary Input Objects are used for indicating the active setting group in this case. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 98: Configuring Dnp3 Protocol Signals

    Direct configured hardware channels in the application configuration (see Figure 76) appear in CMT (see Figure 77). Do not configure these hardware channels to be sent by DNP3, as they are not event-handled. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 99 The left window has a drop down menu for signal selection and buttons for signal movement, see Figure IEC08000337.vsd IEC08000337 V1 EN-US Figure 78: CMT: Container window design when selecting DNP3 protocol Procedure to move signals: Select one or several signals. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 100: Setting Dnp3 Signal Parameters

    Click the two inner arrows to sort signals to another index sequence, or select from the context menu to move one or a set of signals to another array, see Figure 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 101: Configuring Dnp3 Class

    Unsolicited reporting is possible as well. Modify the organization of the classes for each signal individually. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 102: Selecting To Communicate Dnp3 Data Via Rs485 Serial Interface On Com03 Or Com05 Module

    DNP for setting Operation . MSTSERIAL function block, located in MainMenu/IEDConfiguration/ Navigate to the ChToAssociate to Optical . Communication/DNP3.0/MSTSERIAL:1, and set See DNP3 Communication protocol manual, chapter DNP3 parameters, for more detailed information. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 103: Glossary

    Standard format according to IEC 60255-24 Cause of transmission Central processing unit Carrier receive Cyclic redundancy check CROB Control relay output block Carrier send Current transformer Communication unit Capacitive voltage transformer 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 104 Communication interface module with carrier of GPS receiver module Graphical display editor within PCM600 General interrogation command Gas-insulated switchgear GOOSE Generic object-oriented substation event Global positioning system GSAL Generic security application 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 105 Ingression protection, according to IEC standard, level 54 Internal failure signal IRIG-B: InterRange Instrumentation Group Time code format B, standard 200 International Telecommunications Union Local area network Liquid crystal display Local detection device 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 106 Serial link according to EIA standard RS485 Real-time clock Remote terminal unit Substation Automation Select-before-operate Switch or push button to close Short circuit location Station control system SCADA Supervision, control and data acquisition 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 107 The relay does not “see” the fault but perhaps it should have seen it. See also Overreach. 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 108 Three times zero-sequence current. Often referred to as the residual or the earth-fault current Three times the zero sequence voltage. Often referred to as the residual voltage or the neutral point voltage 650 series Engineering manual © Copyright 2013 ABB. All rights reserved...
  • Page 110 ABB AB Grid Automation Products SE-721 59 Västerås, Sweden Phone +46 (0) 21 32 50 00 Scan this QR code to visit our website www.abb.com/protection-control © Copyright 2013 ABB. All rights reserved.

Table of Contents