Polaris RZR 900 2017 Service Manual page 270

Hide thumbs Also See for RZR 900 2017:
Table of Contents

Advertisement

ENGINE / COOLING SYSTEM
13. Verify cam timing is correct. Flywheel TDC mark
should still be aligned (see Step 1) and cam sprocket
markings should line up as shown.
3.136
14. If timing marks are not aligned, remove sprockets
and correct alignment.
15. Remove the Cylinder Holding & Camshaft Timing
Plate (PU-50563) from the end of the camshafts.
16. Rotate the engine using the flywheel and install the
remaining bolt in each camshaft sprocket. Torque the
sprocket bolts to specification.
17. Rotate the engine using the flywheel and torque the
remaining sprocket bolts to specification.
18. Install the front camshaft carrier
retaining bolts.
19. Install the fixed cam chain guide
bolts.
9930588 R02 - 2017-2020 RZR 900 900/S 900/S4 1000/S 1000/S4 Service Manual
TORQUE
Camshaft Sprocket Bolts:
14 ft-lbs (19 N·m)
o
a
and two retaining
© Copyright Polaris Industries Inc.
and two outer

Advertisement

Table of Contents
loading

Table of Contents