Transfer Bracket

US23-2101-02 Rev A

Active Leaf Door Height Adjustment

Note!
Sidelite should be adjusted level and plumb with the proper 1/8"
gap at the head before adjusting active leaf.
1. Loosen the two Wheel Bracket Screws and the anti-riser bolt
on each side of the door.
2. Using the Adjustment Screws, level the door and align
horizontally with the sidelite.
3. After leveling process is complete, retighten Wheel Bracket
Screws, and anti-riser bolts on both sides of door and
recheck for level.
Transfer Bracket – Belt Reconnect
1. Once all doors are installed to header, move doors to closed
position.
Note!
When doors are in the closed position, doors should overlap
each other.
2. With doors in closed position, reconnect belt to transfer
bracket on active leaf #1.
Issued: 9-22-2011