Fsl Installation Procedure - Assa Abloy Besam VersaMax ICU Installation Manual

Telescopic equal panel
Table of Contents

Advertisement

Page 30

FSL Installation Procedure

Note!
Remove packing material from the sidelite, if it has not already
been removed, before installation.
1. Remove Breakout Tube.
2. Place sidelite on "G" track.
3. Line up the (2) connecting posts, located approximately 6"
from each end of the top horizontal, with the (2) holes in the
bottom of the header.
4. Tilt sidelite into place.
5. Lock the sidelite to the header by inserting the M6 x 50
SHC screw through the header into the connecting post.
Note!
Adjust connecting post position, if out of alignment with header,
pre-drilled holes.
Issued: 9-22-2011
G Track
US23-2101-02 Rev A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents