US23-2101-02 Rev A
3. Drill holes through both the interior and exterior jamb wall
and install beauty caps on the exterior holes.
Leveling Header and Jambs
Note!
The header and jambs must be installed plumb, square and level
to ensure proper door operation.
1. Check rough opening for plumb, level and square.
2. Tilt header/jamb assembly into rough opening.
3. Insert shims under jambs as required, to correct for an
uneven floor condition.
Issued: 9-22-2011
Page 17