US23-2101-02 Rev A
FSL, Active Leaf #2 Installation Procedure
1. Position #2 Leaf so the bottom roller guide wheels can be
inserted into cutout in the bottom horizontal rail of sidelite.
2. Position #2 Leaf under the Carrier so that bolt holes in #2
Leaf line up with bolt holes in the Carrier as shown.
3. Install one bolt at each end of carrier to secure #2 Leaf to
Carrier.
4. Make certain the lead edge of #2 Leaf is flush with the lead
edge of the Carrier.
5. Adjust height of carriers to mid-point and tighten Carrier
wheel screws.
Issued: 9-22-2011
Page 31