The door installation process incorporates, unpacking and
installing hardware on the door panels.
It is important that all packing is removed from the door package
so that it will not, later interfere with the operation of the door.
Remove and dispose of all packaging and scrap materials in
accordance with local regulations.
Depending on the options chosen, some or all of the hardware
shown below must be installed or modified on the door panels
prior to installation. All hardware items are kitted with instructions
and required fasteners for each package.

Pivot Plate

US15-2010-01 (LH Plate Kit - Shown)
US15-2010-02 (RH Plate Kit)

Pivot Block

US21-2005-01 (Pivot Block Kit)

"C" Handle

US08-1661-02

Fixed Nose Guide

US15-2009-01 (LH ICU Fixed Guide Kit - Shown)
US15-2009-02 (RH ICU Fixed Guide Kit)

Swing Arm (Optional)

US15-2007-01 (LH ICU Swing Arm Kit - Shown)
US15-2007-02 (RH ICU Swing Arm Kit)

Breakout Cam (Optional)

US15-2002-01 (Breakout Cam Kit)

Sweep (Optional)

50-20-215
If sweeps are included, trim to length required for each panel,
then insert into Sweep Holder. Note: Sweeps will be longer than
the sweep holder. Install sweep and holder into bottom of door
as shown. Once doors are hung, adjust sweeps to desired height
and location, secure with 8 x 32 self-tapping screws.