6.5.2. AC Connection Information

6.5.3. Installing Rectifiers in a PBA-02 System to Balance Phases

In order to provide a balanced load on the incoming AC supply, Install the quantity of rectifiers
required for the Power Supply Unit, with reference to the General Notes for Installing a Rectifier in
section 5.2. on page 49 and according to the table below.
Phase Connected
Table 6-4 Installing Rectifiers in a PBA-02 Power Supply Unit
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
4 core cable of 10mm² minimum
or
10mm² minimum PVC (80°C minimum)
singles in trucking or conduit.
Table 6-3 PBA-02 Cable Rating
Fig. 6-6 PBA-02 AC Rating Information Label
Rectifier Position in
To
Cabinet from Left to
Right
Ø1/Ø2
Ø2/Ø3
Ø1/Ø3
Ø1/Ø2
Ø2/Ø3
Ø1/Ø3
Ø1/Ø2
Ø2/Ø3
Ø1/Ø3
Document No: - 4493-CM-EN-10989402
Flexi -3G Installation & Commissioning Manual
Chapter 6. Installation of AC Cables
Installation Sequence
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
Page 59 of 94