Table of Contents TRANSPORTATION INSTRUCTIONS.....................1 STORAGE INSTRUCTIONS........................2 PREPARING THE SWITCHGEAR FOR INSTALLATION.................2 INTRODUCTION OF THE SWITCHGEAR....................3 DIMENSIONS.............................4 CHECKINGS BEFORE ENERGIZING THE SWITCHGEAR...............5 TEST TO BE CARRIED OUT BEFORE ENERGIZING THE SWITCHGEAR..........5 INSTALLATION OF BUSBARS........................6 ENERGIZING THE SWITCHGEAR......................7 OPERATING INSTRUCTIONS........................8 CIRCUIT BREAKER TESTS BEFORE ENERGIZING THE SWITCHGEAR..........9 INSTALLING PADLOCK...........................12 SAFE USE..............................12 TROUBLESHOOTING..........................13...
Transportation Instructions Transportation with Forklift Carry with palette! Transportation with Sling Max. 90° Remove the bolts which mounts the switchgear to the palette. Transportation on Pipes Roll on the pipes! Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
Preparing the Switchgears for Installation Remove the bolts which mounts the switchgear Disassemble the lifting plates. to the palette. Disassemble the top sheet metal. Pull out the front door of the switchgear. Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
Dimensions (in mm) 1260 Side view Front view Internal side view Internal front view Bottom view Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
THE EARTING SWITCH BEFORE CUTTING DOWN THE ENERGY FROM PREVIOUS STATION DO NOT INTERFERE WITH THE EARTHING MECHANISM WHILE THE LOAD BREAK SPRING IS CHARGED OFF (0) ON (I) Button Button Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
Installation of Busbars Remove the bolts, spheres and replace the bars. Put the bolts and tighten spheres again, torque value to be checked (50Nm). Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
INCOMING FEEDER DO NOT CLOSE THE EARTING SWITCH BEFORE CUTTING DOWN THE ENERGY FROM PREVIOUS STATION DO NOT INTERFERE WITH THE EARTHING MECHANISM WHILE THE LOAD BREAK SPRING IS CHARGED Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
Reopen earthing switch. • Open switchgear front door. • Perform required measurements. • Place cable test device. • After test close the door. • Reopen earthing switch. Perform required measurements. • Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
Closing can be done either manual or motorised by Closing can be done either manual or motorised by pressing ON button on CB or control panel. pressing OFF button on CB or control panel. Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
Page 12
INCOMING FEEDER DO NOT CLOSE THE EARTING SWITCH BEFORE CUTTING DOWN THE ENERGY FROM PREVIOUS STATION DO NOT INTERFERE WITH THE EARTHING MECHANISM WHILE THE LOAD BREAK SPRING IS CHARGED Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
Page 13
Closing can be done either manual or motorised by Closing can be done either manual or motorised by pressing ON button on CB or control panel. pressing OFF button on CB or control panel. Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
DO NOT INTERFERE WITH THE EARTHING MECHANISM WHILE THE LOAD BREAK SPRING IS CHARGED Safe Use 02 ING Switchgear front door can only be placed and removed when the earthing switch is in closed position. Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
Check the LV cable connections Check the LV fuses Charging motor does not work. Check the earthing switch Check the motor supply Check the motor supply polarity Contact with sales department. Spare Part Ulusoy HMH24-04 Incoming/Outgoing Switchgear with Circuit Breaker User Manual www.eaton.com...
Page 16
Eaton’s mission is to improve the quality of life and the environment through the use of power management technologies and services. We provide sustainable solutions that help our customers effectively manage electrical, hydraulic, and mechanical power - more safely, more efficiently, and more reliably.