3 core cable of 25mm² minimum
or
25mm² minimum PVC (80˚C minimum)
singles in trunking or conduit.

6.4.3. AC Connection Information

6.4.4. Installing Rectifiers in a PBA-01 System to Balance Phases

In order to provide a balanced load on the incoming AC supply, Install the quantity of rectifiers
required for the Power Supply Unit, with reference to the General Notes for Installing a Rectifier in
section 5.2. on page 49 and according to the table below.
Phase Connected
Table 6-2 Installing Rectifiers in a PBA-01 Power Supply Unit
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
1Ø+N+PE
Table 6-1 PBA-01 Cable Rating
Fig. 6-3 PBA-01 AC Rating Information Label
Rectifier Position in
To
Cabinet from Left to
Right
Ø1
Ø2
Ø3
Document No: - 4493-CM-EN-10989402
Flexi -3G Installation & Commissioning Manual
Chapter 6. Installation of AC Cables
3Ø+N+PE
5 core cable of 10mm² minimum
or
10mm² minimum PVC (80°C minimum)
singles in trucking or conduit.
Installation Sequence
1
2
3
4
5
6
7
8
9
1
4
7
2
5
8
3
6
9