Eaton Flexi-3G Installation & Commissioning Manual page 82

Advertisement

Flexi -3G Installation & Commissioning Manual
Chapter 9. Appendices
ELECTRICAL & TESTING
Inspect that AC test results carried out as
per IEE Regulations – check system
logbook entry.
Confirm DC Bus integrity.
Record float voltage measured at Main bus
bars.
Test Low Voltage Disconnect (LVD) if
applicable and ensure correct function.
All batteries are on float charge.
Record AC supply voltages
Check Analogue measurements as
required in Section 8.
Local Alarms generated and reset.
DOCUMENTATION
Ensure that a copy of all documentation is left within
a document holder with the equipment and other
copies are forwarded on to Eaton.
Documents to be left on site:
VERIFICATION & SIGN OFF
SIGNATURE:
COMPANY
Page 82 of 94
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Document No: - 4493-CM-EN-10989402
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
Inspection of DC system installation performed,
sheet completed and signed.
Record float voltage of System displayed on
V
SC200 Controller.
Record load current.
Record battery current.
V
System I/P configuration is appropriate for and
correctly configured for the mains supply.
V
V
V
Perform local alarm tests as required in
Section 8.
Check Remote comms ie. Ethernet and/or
SNMP.
Initial Electrical Measurement & Record
Schedule as prescribed by local regulations
Electrical Completion & Initial Inspection &
Testing Certificate as prescribed by local
regulations
Site Acceptance Certificate*
Any other Test Sheets
DATE:
PRINT NAME:
POSITION:
Y / N
V
A
A
Y/N
Y / N
Y / N