4.2. Installing the Battery Cables

1. Fit the required number of battery MCBs (one per battery string), starting from the RHS, to the DIN
rail. Fit the MCB over the comb and clip in place.
1
1
+Ve Return Bar
4
-Ve (Grey) Battery Cable
2. Wire the auxiliary switch into the Fuse Fail PCB, ref System Wiring Diagrams in Appendix B. on
page 74
3. Fit the required number of cable clamps (one per battery string) to the +Ve return bar, starting from
the RHS of the bar.
4. Lay and secure with cable ties, the battery loom cables from the appropriate battery shelf , up
through the cabinet on the RHS, over the top of the +Ve return bar, to be terminated to the return
bar and the battery MCB.
5. Trim the length of the +Ve (Blue) cable to be fitted to the cable clamp on the return bar if required.
Start from the clamp nearest to the RHS. Strip the cable insulation to approx 8mm and insert into
the cable clamp. Tighten to 6Nm.
6. Trim the length of the -Ve (Grey) cable to be fitted to the MCB if required. Start from the breaker
nearest to the RHS. Strip the cable insulation to approx 8mm and insert into top of the MCB.
Tighten to 3.5Nm for >25A type MCBs or 2.5Nm for <25A type MCBs.
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
2
-Ve Comb
5
+Ve (Blue) Battery Cable
Figure 4-1 Fitting the Battery String MCBs
Figure 4-2 Laying and securing the Battery Cable Loom
Document No: - 4493-CM-EN-10989402
Flexi -3G Installation & Commissioning Manual
Chapter 4. Battery Installation
4
3
2
3
5
Battery MCB
Page 37 of 94