VT6L Maintenance 18. Controller Unit
Fieldbus
(1) Turn OFF the Manipulator.
I/O Module
(2) Remove the securing nut (M12) on the relay cable.
Removal
(3) Remove the bolts which secure the optional
Protection model
Profibus-DP
(4) Remove the gasket and spacers.
(5) Loosen and remove the two D-sub connector securing screws from the fieldbus I/O
(6) Loosen the screws on the fieldbus I/O module
(7) Remove the fieldbus I/O module.
(8) Install the optional slot cover, gasket, and spacers.
NOTE
170
block to the connector plate.
Hexagon socket head bolts:
(supplied with the module.)
6-M3×15 (with seal washer)
If the cable is connected to the optional
block, in advance, remove the cable from
the optional block.
module.
by using the supplied hex lobe wrench.
The module can be removed by pulling the screws forward with the screws
loosened.
Hexagon socket head bolts: 6-M3×8 (with seal washer.)
Tightening torque: 2.0 ± 0.1N·m
Be sure to embed the seal washers (supplied with the module) when tightening with
hexagon socket head bolts.
If the seal washers are not embedded, water protection performance may not be
ensured.
Make sure that there is no scratch and dust on the gasket mounting surface.
If the gasket is damaged or dusty, water protection performance may not be ensured.
Gasket
+ Spacers
VT series Maintenance Manual Rev.2
Connector
plate
Optional
block
Gasket, Spacers

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vt6-a901sVt6-a901cVt6-a901pVt6-a901s-dc

Table of Contents