Fieldbus
(1) Turn OFF the Manipulator.
I/O Module
(2) Remove the bolts which secure the optional
Removal
Protection model
EtherCAT,
EtherNet IP,
PROFINET
(3) Remove the two relay cables from the
(4) Remove the gasket and spacers.
(5) Disconnect the relay cable from the fieldbus
(6) Loosen the screws by using the supplied hex
(7) Remove the fieldbus I/O module.
(8) Install the optional slot cover, gasket, and spacers.
NOTE
VT series Maintenance Manual Rev.2
block to the connector plate.
Hexagon socket head bolts:
(supplied with the module.)
6-M3×30 (with seal washer)
conector on the optional block side.
I/O module.
lobe wrench.
The module can be removed by pulling the screws forward with the screws
loosened.
Hexagon socket head bolts: 6-M3×8 (with seal washer.)
Tightenning torque: 2.0 ± 0.1N·m
Be sure to embed the seal washers (supplied with the module) when tightening
with hexagon socket head bolts.
If the seal washers are not embedded, water protection performance may not be
ensured.
Make sure that there is no scratch and dust on the gasket mounting surface.
If the gasket is damaged or dusty, water protection performance may not be
ensured.
VT6L Maintenance 18. Controller Unit
Gasket +
Spacers
Module
Connector
Plate
Optional
Block
Gasket, Spacers
Relay Cable