ITech IT7900P Series User Manual page 28

Programmable ac power supply
Hide thumbs Also See for IT7900P Series:
Table of Contents

Advertisement

The AC input is three phase and balanced, connecting the power cord as below.
Connecting the power cord
1. Confirm that the switch of the AC power distribution box is off.
2. Confirm that the power switch is in the OFF position and verify that there is
3. Remove the protective cover outside the AC input terminal on the rear panel.
4. Connect one end of the power cable's round terminal to the AC power input
When connecting the instrument which rated power is 6kVA or above.
no dangerous voltage on the connection terminals.
terminal on the instrument's rear panel.
a) You only need to connect the red/green/yellow (or brown/black/gray)
live wires to the terminals on the rear panel, which are not required to
correspond to L1, L2 and L3 terminals one by one.
b) The yellow-green wire is grounding wire, which is connected to the
protective grounding terminal (PE).
Copyright ©ITECH Electronic Co., Ltd.
Installation
26

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IT7900P Series and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF