Vatech PaX-i Insight Installation Manual page 72

Hide thumbs Also See for PaX-i Insight:
Table of Contents

Advertisement

4. Installing the Equipment: Base Stand (Optional)
When the aligning is completed, tighten four Wrench Bolts (M8) of the Main unit
3.
fully.
When the Ceph unit is tilted to the front or back
Untighten four Wrench Bolts (M8) of the Ceph unit slightly.
1.
Align the level of the Ceph on both the front and back sides unit until the bubble
2.
on the Spirit Level centers in the middle, by adjusting the Align Bolt (M10).
62
PaX-i Plus / Insight (Model: PCH-30CS) Installation Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PaX-i Insight and is the answer not in the manual?

This manual is also suitable for:

Pax-i plusPch-30cs

Table of Contents