General Info
Unloading the Sprayer
To unload the sprayer, you need a crane.When unloading the sprayer with a crane, please observe the lifting points, and
make sure that the straps or belts used for lifting can handle the load.
€
DANGER! Lifting of machines require special training according to national regulations.
μ
ATTENTION! Only lift the sprayer with empty tanks!
Before Putting the Sprayer Into Operation
Although the sprayer has been supplied with a strong and protective surface treatment on steel parts, bolts etc. in the
factory, it is recommended to apply a film of anti-corrosion oil (e.g. CASTROL RUSTILO or SHELL ENSIS FLUID) on all metal
parts in order to avoid chemicals and fertilizers discolouring the paint or surface-treated parts.
If this is done before the sprayer is put into operation for the first time, it will always be easy to clean the sprayer and keep
the paint or surface-treated parts clean for many years. This treatment should be carried out every time the protection film
is washed off.
Hydraulic Support Leg
The hydraulic support leg is activated via a separate hydraulic outlet on the tractor. Connect the hydraulic hoses from the
support leg to the tractor and test the function of the support leg carefully.
1. Attach the sprayer to the tractor prior to raise or lower the support
leg.
• Retracted position (A), when already attached to tractor.
• Support position (B), when the sprayer stand on the
support leg.
2. If retracted (A), pull the lock (C) to unlock the support leg from its
storing position.
3. Turn the lever to unlocked position
hydraulics.
4. Use the tractor hydraulic lever to raise or lower the support leg.
5. Secure the support leg by turning the lever to position
€
DANGER! Always double check that the lever is in the locked
position
when leaving the sprayer standing on the support
leg.
to unlock the support leg
.
4 - Sprayer Setup
73