Sign In
Upload
Manuals
Brands
Hardi Manuals
Farm Equipment
AEON CENTURA DELTA FORCE
Hardi AEON CENTURA DELTA FORCE Manuals
Manuals and User Guides for Hardi AEON CENTURA DELTA FORCE. We have
1
Hardi AEON CENTURA DELTA FORCE manual available for free PDF download: Instruction Book
Hardi AEON CENTURA DELTA FORCE Instruction Book (218 pages)
Brand:
Hardi
| Category:
Farm Equipment
| Size: 32.28 MB
Table of Contents
EU Declaration EU Declaration of Conformity
3
Table of Contents
5
General Safety Instructions
11
Obligations and Liability
11
Comply with the Instruction Book
11
Before First Use of the Sprayer
11
Obligations of the Operator
14
Risks in Handling the Sprayer
15
Disclaimer
15
Organizational Measures
16
Personal Protective Equipment
16
Representation of Safety Symbols
17
Explanation of Symbols
17
Warning Signs on the Sprayer
18
Explanation of Labels
18
Safety and Protection Equipment
20
Safety at Start up
20
Faulty Safety Equipment
20
Informal Safety Measures
21
Additional Safety Instructions
21
Operator Training
22
Authorized Persons
22
Safety Measures under Normal Operation
23
Protection Equipment
23
Residual Energy
24
Possible Dangers
24
Service and Maintenance Work
25
Statutory Inspection
25
Preventive Measures
25
Design Changes
26
Operator Limitations
26
Spare Parts, Wear Parts and Aids
26
Cleaning and Disposal
27
Environmental Protection
27
Workstation
28
Intended Place for Operator
28
Risks of Non-Compliance
28
If the Safety Information Is Ignored
29
Possible Risks and Dangers
29
Safety Information for Operators
30
General Safety and Accident Prevention
30
Coupling and Uncoupling the Sprayer
31
Use of the Sprayer
32
Road Transport
33
Hydraulic System
35
Electrical System
36
Universal Joint Shaft
37
Working Area of the Sprayer
38
Field Sprayer Operation
39
Environmental Precautions
39
Service Work Precautions
40
Cleaning
40
Service and Maintenance
41
Description
43
General Info
43
View
43
View
44
Identification Plate
45
Sprayer Use
47
Steel Frame
47
Tanks
47
Lifetime
47
Liquid System
48
Pump
48
Turbofiller
48
Dynamicfluid4 Pressure Regulation
50
Filters
51
Easycleanfilter
51
Cyclonefilter
52
Rinsetank
53
Cleanwatertank
53
Autoselect
53
Diagram - Liquid System
54
Fluidbox 8000
56
Main Screen
56
Fluid Functions Menu
57
Autofill Menu
58
Agitation Menu
59
Service Menu
60
Calculator Menu
61
Gravity Menu
61
Hydraulic System
62
Hydraulic Blocks
62
Spray Boom
64
General Info
64
Terminology
64
Standard Boom Features
64
Available Working Widths
65
Other Equipment
66
Control Units in the Tractor
66
Nozzle Pressure Gauge
66
Comforttrack
67
Manualtrack
67
Autoterrain
68
Autoslant (Optional)
68
Paralift Hydraulics
68
Right Side Cover
69
External Cleaning Device
70
Rinsetank Level Indicator
70
Safetylocker
71
Night Spraying Light
71
Sprayer Setup
73
General Info
73
Unloading the Sprayer
73
Before Putting the Sprayer into Operation
73
Hydraulic Support Leg
73
Jack up the Sprayer
74
Paralift Lock Bracket
74
Tractor Selection
75
Applicable Tractors
75
Transmission Shaft
76
Operator Safety
76
PTO Installation
76
Mechanical Connections
77
Drawbars
77
Hose Package Support
77
Comforttrack Steering Potentiometer Connection
77
Hydraulic Systems
78
General Info
78
Requirements for Tractor
78
Open or Closed Centre Hydraulics
79
Load Sensing Setup
80
Adjustment of Boom Folding Speed
81
Adjustment of Pendulum Damping
82
Electrical Connections
84
Power Supply
84
Road Safety Kit
84
Installation of Control Unit Brackets
85
Speed Sensor for Sprayer
86
Liquid System
87
Autoselect
87
Water Sensitive Paper
87
Turbofiller Adjustment
88
Cyclonefilter
88
Pneumatic System
89
Oil Flow Rate Adjustment
89
Track Width, Axles and Wheels
90
Overview - Rear Axle
90
The Track Width
91
Link Arm
92
Altering the Track Width
94
Readjusting the Wheel Alignment
95
Readjusting the Mudguards
96
Adjusting the End Stop
97
Minimum Turning Radius
98
Brakes
99
Pneumatic - Dual Line Air Brake System
99
Connecting the Air Hoses
100
Operation
101
General Info
101
Environmental Info
101
Sprayer Use
101
Steering
102
Driving Technique for Comforttrack
102
Spray Boom
103
Safety Info
103
Operating the Grip
103
Manoeuvring of the Boom (V- and Z-Versions)
104
Single-Side Half Boom Wing (Option for 2-Fold Booms)
105
Single-Side 2/3 Boom Wing (Option for 3-Fold Booms)
105
Boom Slant Indicator
106
Night Spraying Light
106
Liquid System
107
General Info
107
Operating the Control Units While Spraying
107
Filling/Washing Location Requirements
108
Filling of Water
109
Filling the Maintank through Tank Lid
109
External Filling Device Without Autofill
110
Autofill Using External Filling Device
111
Filling the Rinsetank
112
Filling the Cleanwatertank
112
Safety Precautions - Crop Protection Chemicals
113
Operating the Turbofiller
113
Using the Fluidbox Chemical Calculator
115
Autofill and Fill Liquid Chemicals Using the Turbofiller
116
Filling Liquid Chemicals Using the Turbofiller
119
Autofill and Fill Powder Chemicals Using the Turbofiller
120
Filling Powder Chemicals Using the Turbofiller
123
Agitation before Resuming a Spray Job
124
Before Returning to Refill the Sprayer
124
Parking the Sprayer
125
Turbofiller Rinsing
125
Autoselect Duo
127
Liquid Fertilizer
128
Additional Information
128
Operating Limits
129
Cleaning
130
General Info
130
Standard Cleaning
131
Use of Cleaning Agents
131
General Cleaning of Maintank and Liquid System
132
Cleaning and Maintenance of Filters
132
Cleaning Maintank and Liquid System
133
Technical Residue
134
Using the Drain Valve
135
Pressureempty the Maintank
135
Full Internal Cleaning (Soak Wash)
135
Outside Cleaning - Use of External Cleaning Device
137
Maintenance
139
Lubrication
139
General Info
139
Suitable Lubricants
139
Grease Nipple
140
Grease Gun Calibration
140
Lubrication Plan - Boom Centre
141
Lubrication Plan - Boom Wings
142
Lubrication Plan - Trailer/Paralift
143
Lubrication and Oiling Plan - PTO
144
Greasing the Pump
145
Service and Maintenance Intervals
146
General Info
146
Periodic Inspection
146
Paralift Lock Bracket
146
Tightening Bolts and Nuts
147
Tightening Hydraulic Hoses
148
10 Hours Service - Easycleanfilter
149
10 Hours Service - Cyclonefilter
150
10 Hours Service - Nozzle Filters
150
10 Hours Service - Spraying Circuit
150
10 Hours Service - Brakes
150
10 Hours Service - Air Tank for Brakes
151
50 Hours Service - Grease Points
151
50 Hours Service - Greasing the Pump
151
Hours Service - Transmission Shaft (PTO)
151
50 Hours Service - Wheel Nuts
152
50 Hours Service - Tyre Pressure
152
50 Hours Service - Air Brakes
152
100 Hours Service - Re-Tightening Bolts
153
100 Hours Service - Re-Tightening the Spray Boom
153
100 Hours Service - Air Filter/Lubricator
153
250 Hours Service - Hydraulic Circuit
154
250 Hours Service - Replacing the Filter Element in the Hydraulic Supply Oil Filter
154
250 Hours Service - Hoses and Tubes
154
250 Hours Service - Oil Filling of the Air Filter/Lubricator
155
250 Hours Service - Wheel Bearings
155
250 Hours Service - Adjustment of Wheel Brakes
155
250 Hours Service - Air Brake Filters
156
500 Hours Service - Replacing the Filter Element in the Air Filter/Lubricator
156
1000 Hours Service - Wheel Bearings and Brakes
157
Occasional Maintenance
159
General Info
159
Lifting and Removing the Pump
159
Speed Transducer for the Pump
159
Pump Valves and Diaphragms Renewal
160
Feed Pipe Clamp Assembly
162
Nozzle Holder Assembly
162
Feed Pipe Assembly
165
Safety Valve Activation
166
Readjustment of Boom - General Info
167
Adjustment of Springs in Centre Section
168
Adjustment of Boom Tilt
169
Horizontal Alignment of Inner Sections
170
Horizontal Alignment of Inner Sections
171
Vertical Alignment of Outer Sections 1 and 2
172
Horizontal Alignment of Breakaway Section
173
Vertical Alignment of Breakaway Section
173
Spring Load for Breakaway Section
174
Adjustment of Boom Lock
175
Alignment of Rubber Pads on Spray Boom
175
Yaw Damping
176
Paralift Suspension
177
Wear Bushing Replacement on Paralift
177
Wear Bushing Renewal on Steering
178
Suspension Dampers
178
Replacement of the Transmission Shaft Shield
178
Replacement of Transmission Shaft Cross Journals
178
Light Bulb Change
178
Comforttrack Potentiometer Calibration
178
Tyre Change
179
Venting the Boom Hydraulics
180
Off-Season Storage
181
General Info
181
Before Storage
181
After Storage
182
Fault Finding
183
Operational Problems
183
General Info
183
Liquid System
184
Pump
185
Hydraulic System, Z-Version
186
Comforttrack
186
Overview of Fuses
187
Mechanical Problems
189
Emergency Operation - Hydraulics
189
Emergency Operation - Easycleanfilter
189
Technical Specifications
191
Dimensions
191
General Info
191
Overall Dimensions and Specifications
191
Wheel and Axle Dimensions
192
Weight
192
Pump Specifications
193
Pump Model 464/5.5
193
Pump Model 464/6.5
193
Pump Model 464/10.0
193
Pump Model 464/12.0
193
Pump Capacity
194
Other Specifications
195
Filters
195
Brakes
195
Transmission Shaft
195
Temperature and Pressure Ranges
195
Technical Residual
196
Airborne Noise Emission
196
Tyre Pressure
197
Tractor Requirements
199
Engine Output
199
Main Pump
199
Electrics
199
Hydraulics
200
Brakes
200
Materials and Recycling
201
Disposal of the Sprayer
201
Disposal of Cleaning Water
201
Electrical Connections
202
Rear Lights
202
Boom and Work Light
202
Diagrams
203
Hydraulic for a 24 Metres Boom (Z-Version)
203
Hydraulic for 24-30 Metres Booms (Z-Version)
204
Hydraulic for 27-30 Metres Booms (Z-Version)
205
Hydraulic for 32-39 Metres Booms (Z-Version)
206
Hydraulic for 32-39 Metres Booms (Z-Version)
207
Hydraulic for the Chassis
208
Hydraulic for the Chassis - Overview
209
Pneumatic Dual Line Air Brake System
210
Advertisement
Advertisement
Related Products
Hardi AEON CENTURA TWIN FORCE
Hardi NEPTUN AB820
Hardi ZATURN AG920
Hardi EVRARD ALPHA 2500
Hardi ZENIT A750
Hardi ZENIT AG750
Hardi ALPHA evo EcoDrive TWIN FORCE
Hardi ALPHA evo ALU-TWIN FORCE
Hardi ARROW 2000
Hardi ALPHA EVO II EcoDrive
Hardi Categories
Paint Sprayer
Farm Equipment
Controller
Boom Lifts
Tractor Accessories
More Hardi Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL