Getting Started

2
2.1
Further reading
Before production
Getting Started

Preparing the Leica PaveSmart 3D System

Refer to the Leica PaveSmart 3D Technical Reference Manuals, the iCON site User Manual or
to the TS15 User Manual on how to perform a Resection (Free Station), Known Point setup
and how to take As-Built measurements.
Connect the MPC Computer: Attach the MPC1310 computer to the machine. Connect
power, radio and CAN cables if available. Machines using CANBUS communication should be
connected by the MJB1305 Paving Junction Box.
Set up all required sensors: Robot (and GPS reference station if applicable) with the
required accessories - battery, radio and cables. Ensure that all robots are running either in
MGuide with the appropriate configuration set, or correctly configured when working with a
hand-held application iCON site or RoadRunner.
*depending on application tolerances. Milling and asphalt paving may be able to work up to
150m (450ft)
PaveSmart 3D UM 12
a) Max. 100 m (300 ft)*
b) Min. 5 m (15 ft)