Starter Installation; Connector Servicing - BRP EVINRUDE E-TEC 115 HP 2011 Service Manual

Table of Contents

Advertisement

To test the assembly and operation of the starter,
refer to No Load Current Draw Test on p. 101.

Starter Installation

Apply Locquic Primer and Nut Lock to the threads
of the four starter mounting screws. Position the
starter and install the screws and lock washers.
First, tighten the top two screws, then the bottom
two screws, to a torque of 168 to 192 in. lbs. (19.0
to 21.5 N·m).
1
1. Screws
Attach starter positive (+) cable to post with lock
washer and nut; tighten securely. Coat connec-
tions with Black Neoprene Dip.
CONNECTOR
SERVICING
DEUTSCH Connectors
IMPORTANT:
mended. Incorrect grease application can cause
electrical or warning system problems.
To disconnect the connector, press the latch and
pull the connectors apart.
To connect the connector, confirm that the seal is
in place. Clean off any old grease and dirt from
connectors. Apply a light coat of Electrical Grease
to seal only. Push connectors together until
latched.
1
005373
1
1. Latch
2. Seal
Terminal Removal
Use
hook-end
P/N 342667, to pull out wedge from receptacle, or
use other end of tool to pry out wedge from plug.
Use needle-nose pliers to remove wedge from
3-pin receptacle.
1. Wedge
ELECTRICAL AND IGNITION

CONNECTOR SERVICING

Electrical
Grease
is
of
Connector
Service
recom-
2
6
42079A
Tool,
1
42327
123

Advertisement

Table of Contents
loading

Table of Contents