Treadmill - GE MAC 1200 Operator's Manual

Hide thumbs Also See for MAC 1200:
Table of Contents

Advertisement

Treadmill

General Treadmill Considerations
8-12
Stress Tests: Ergometers with Remote Start Pulse
1. Select the ergometer type (Chapter 10,
2. Select the test protocol (configuration, Chapter 10,
Mode"
section).
3. Press
. At this stage, the resting ECG of the sitting patient is
recorded. Continue collecting the ECG signal until the first ST
measurement is completed or the results of the first BP
measurement are available.
4. Press
. At this point, the ECG of the patient standing upright is
recorded.
5. Press
.
Hyperventilating Patient
The next stage is reserved for a hyperventilating patient's ECG.
6. Start the treadmill with
follows, in which the patient gets used to the treadmill exercise.
7. Press
. Once the patient is familiar with walking on the
treadmill, initiate the actual test with
From this point forward, the program controls the entire test
including the recovery phase.
Stop the test at any time with
Stress Test"
on page 8-7 for more information.
127(
The treadmill can be stopped at any time with the emergency
stop button.
When using the treadmill model TM400E, it is important to adjust
the same unit of speed measurement at the ergometer and at the
CardioSys system (km/h or mph).
MAC 1200/1200 ST
2012250-021
"Communication"
Start
and press
. The warm-up stage
.
. Refer to
"End/Cancel a
section).
"Stress Test
Revision C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mac 1200 st

Table of Contents