Managing Device Diagnostics

Performing GBIC Uplink Testing

STEP 3
Performing GBIC Uplink Testing
STEP 1
ESW 500 Series Switches Administration Guide
Click Done to close the window.
GBIC Uplink Page
The
cables. Optical transceiver diagnostics can be performed only when the link is
present. During the port test, the port moves to a down state.
Click Maintenance > Diagnostics > GBIC Uplink Ports. The
opens:
GBIC Uplink Ports
The
Port — Displays the port number on which the cable is tested.
Temperature — Displays the temperature in Celsius at which the cable is
operating.
Voltage — Displays the voltage at which the cable is operating.
Current — Displays the current at which the cable is operating.
Output Power — Indicates the rate at which the output power is transmitted.
Input Power — Indicates the rate at which the input power is transmitted.
Transmitter Fault — Indicates if a fault occurred during transmission.
Loss of Signal — Indicates if a signal loss occurred in the cable.
Data Ready — Indicates the data status.
allows network managers to perform tests on Fiber Optic
page contains the following fields:
19
GBIC Uplink Ports
Page
426

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents