Cisco IE 3000 Series Hardware Installation Manual page 113

Cisco systems switch installation guide
Hide thumbs Also See for IE 3000 Series:
Table of Contents

Advertisement

Appendix B
Installation In a Hazardous Environment
Figure B-16
source and an optional secondary power source.
Figure B-16
1
Power source A positive connection
2
Power source A return connection
3
External device 1, relay wire connection
4
External device 1, relay wire connection
If your power source is –48 VDC, this table descibes the your wiring connections for
1
Power source A return connection
2
Power source A –48 VDC connection
3
External device 1, relay wire connection
4
External device 1, relay wire connection
Step 8
(Optional) If you plan to connect external alarm devices to the alarm relays and the switch is already
installed, go to the
Switch Operation" section on page
OL-13017-01
shows the completed DC-input wiring on a power and relay connector for a primary power
Completed DC Power Connections on the Power and Relay Connector
1
2
3
4
"Wiring the External Alarms" section on page
B-14.
5
6
7
8
5
Power source B positive connection
6
Power source B return connection
7
External device 2, relay wire connection
8
External device 2, relay wire connection
5
Power source B return connection
6
Power source B –48 VDC connection
7
External device 2, relay wire connection
8
External device 2, relay wire connection
B-38. Otherwise, go to the
Cisco IE 3000 Switch Hardware Installation Guide
Verifying Switch Operation
Figure
B-16.
"Verifying
B-23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents