Connecting A Pc Or A Terminal To The Console Port - Cisco IE 3000 Series Hardware Installation Manual

Cisco systems switch installation guide
Hide thumbs Also See for IE 3000 Series:
Table of Contents

Advertisement

Appendix B
Installation In a Hazardous Environment

Connecting a PC or a Terminal to the Console Port

To connect a PC to the console port, use the supplied RJ-45-to-DB-9 adapter cable. To connect a terminal
to the console port, you need to provide an RJ-45-to-DB-25 female DTE adapter. You can order a kit
(part number ACS-DSBUASYN=) with that adapter from Cisco. For console-port and adapter-pinout
information, see the
The PC or terminal must support VT100 terminal emulation. The terminal-emulation
software—frequently a PC application such as HyperTerminal or Procomm Plus—makes
communication between the switch and your PC or terminal possible during the POST.
If you connect or disconnect the console cable with power applied to the switch or any device on the
Warning
network, an electrical arc can occur. This could cause an explosion in hazardous location
installations. Be sure that power is removed or the area is nonhazardous before proceeding.
To verify switch operation, perform POST on the switch in a nonhazardous location before
installation. Statement 1065
Follow these steps to connect the PC or terminal to the switch:
Step 1
Make sure that your terminal-emulation software is configured to communicate with the switch using
hardware flow control.
Step 2
Configure the baud rate and data format of the PC or terminal to match these console-port default
characteristics:
After you get access to the switch, you can change the port baud rate. See the switch software
configuration guide for instructions.
Step 3
Insert the adapter cable in the console port. See
section on page C-4
OL-13017-01
"Cable and Adapter Specifications" section on page
9600 baud
Eight data bits
One stop bit
No parity
for pinout descriptions.)
Figure
B-8. (See the
"Cable and Adapter Specifications"
Cisco IE 3000 Switch Hardware Installation Guide
Verifying Switch Operation
C-4.
B-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents