Download Print this page

Landoll Brillion WL360 Operator's Manual page 38

Folding pulvi-mulcher

Advertisement

Wing Frame S-Tine
Installation
1. Tooth locations are shown in Figure 2-20. For ease of
installation, assemble points with 3/8-16 Cultivator
Bolts and Locknuts to spring tines before mounting
onto tooth tubes. See Figure 2-14. Install 7 Teeth on
the front tube and 8 on the rear as shown in
Figure 2-21.
2. Attach the Left Hand Control Arm to the Front Tube
using 5/8-11 U-Bolts, Lock Washers and Nuts. Attach
the Right Hand Control Arm to the Rear Tube using
5/8-11 U-Bolts, Lock Washers and Nuts.
3. Attach the Cylinder Arm to the Front Tube using
5/8-11 U-Bolts, Lock Washers and Nuts.
4. Connect the Front and Rear Tubes by placing two
Straps onto the Control Arms. Place a 3/4 Flat
Washer on each side of the Control Arm Lug, place
one 3/4 Flat Washer onto the 3/4 x 2-3/4 Clevis Pin
then slide through, place a 3/4 Flat Washer on and
insert 1/8 x 1-1/4 Cotter Pin.
5. Check to ensure there is no binding and no
interference with the Tines.
6. Attach the 3 x 8 Hydraulic Cylinder to the Front Tube
using Pins provided.
Carriage Bolt,
1/2-13 X 3-1/2
Clamp
Figure 2-21: S-Tine Installation
2-22
TABLE OF CONTENTS
S-Tine
Nut,1/2-13
DUCKFOOT
Cultivator Bolt
Duckfoot Point
REVERSIBLE
Cultivator Bolt
Reversible Point
Figure 2-22: S-Tine Points
Locknut,
3/8-16
Locknut,
3/8-16
9J577-0822

Advertisement

loading