Download Print this page

Landoll Brillion WL360 Operator's Manual page 30

Folding pulvi-mulcher

Advertisement

Center Frame S-Tine
Installation
Tooth locations are shown in Figure 2-12. For ease of
installation, assemble points with 3/8-16 Cultivator Bolts
and Locknuts to spring tines before mounting onto tooth
tubes. See Figure 2-14. Install 15 teeth on the front tube
and 14 on the rear as shown in Figure 2-13.
1. Attach the Right Hand and Left Hand Control Arms to
the Front Tubes using 5/8-11 U-Bolts, Lock Washers
and Nuts. Repeat for the Rear Tubes. See
Figure 2-15.
2. Attach the Cylinder Arms to the Front Tube using
5/8-11 U-Bolts, Lock Washers and Nuts.
3. Connect the Front and Rear Tubes by placing the Link
Assembly onto the Control Arms. On the Front Tube
place a 3/4 Flat Washer on each side of the Control
Arm Lug, slide 3/4 x 2-3/4 Clevis Pin through, place
four 3/4 Flat Washers on the Pin and insert 1/8 x 1-1/4
Cotter Pin.
4. On the Rear Tube place a 3/4 Flat Washer on each
side of the Control Arm Lug, place one 3/4 Flat
Washer onto the 3/4 x 2-3/4 Clevis Pin then slide
through, place three 3/4 Flat Washers on the Pin and
insert 1/8 x 1-1/4 Cotter Pin.
5. Check to ensure there is no binding and no
interference with the Tines.
6. Attach the 3 x 8 Hydraulic Cylinders to the Front
Tubes using Pins provided.
Carriage Bolt,
1/2-13 X 3-1/2
Clamp
Nut,1/2-13
Figure 2-13: S-Tine Installation
2-14
TABLE OF CONTENTS
DUCKFOOT
Cultivator Bolt
REVERSIBLE
S-Tine
Reversible Point
Duckfoot Point
Cultivator Bolt
Figure 2-14: S-Tine Points
Locknut,
3/8-16
Locknut,
3/8-16
9J577-0822

Advertisement

loading