B
d. Position bracket (A) and install bolts.
shorter bolts (B) are installed at the back inboard
locations. Torque as follows:
1. Snug bottom bolts.
2. Tighten and torque back bolts to 330 ft·lbf
(447 Nm).
3. Tighten and torque bottom bolts to 330 ft·lbf
(447 Nm).
e. Lower tractor to ground.
IMPORTANT
f.
Retorque bolts after first 5 and 10 hours of
operation.
Form # 169018
UNLOADING AND ASSEMBLY
A
The two
STEP 5. INSTALL STEPS
a. Install two ½ in.x1.0 hex bolts in upper holes in
platform. Do not thread in fully.
b. Hang step assembly (both step assemblies are
the same) on bolts.
c. Install two ½ in.x1.0 lg. hex bolts in lower holes
in step and tighten.
d. Tighten upper bolts installed in step a.
e. Repeat for other step assembly.
12
Model Year - 2009