Step 3. Remove Side Deflectors; Step 4. Install Gauge Rollers (Optional); Step 5. Install Additional Skid Shoes (Optional) - MacDon A30-S Unloading And Assembly Instructions

Pull-type mower conditioner
Table of Contents

Advertisement

g. Approach
from
underside,
platform, and take to storage or set-up area.
h. Set machine down securely on level ground.
i.
Repeat for other header.
j.
Check headers for shipping damage and
missing parts.
STEP 3.
REMOVE SIDE
DEFLECTORS
D
A
a. Place wooden blocks (A) between forming shield
top cover (B) and lifting beam (C).
b. Cut shipping bands, and remove side deflectors
(D).
c. Leave lifting framework in place to support the
top cover as the windrower is lowered.
169001
UNLOADING AND ASSEMBLY
lift
header
off
B
C
11
STEP 4.
INSTALL GAUGE
ROLLERS (Optional)
This kit may be installed later in the
header assembly sequence, but it may be
easier prior to laying the header down.
If kit not supplied, proceed to STEP 5. INSTALL
ADDITIONAL
SKID
Otherwise
refer
ROLLERS for installation details.
STEP 5.
INSTALL ADDITIONAL
SKID SHOES (Optional)
This kit may be installed later in the
header assembly sequence, but it may be
easier prior to laying the header down.
If kit not supplied, proceed to STEP 6. LOWER
MOWER CONDITIONER. Otherwise refer to
STEP 23B. SKID SHOES for installation details.
NOTE
SHOES
(Optional).
to
STEP
23A.
GAUGE
NOTE
Revision E

Advertisement

Table of Contents
loading

This manual is also suitable for:

A30-d

Table of Contents