Setting-Out Line Point - Sokkia CX-62 Operator's Manual

Table of Contents

Advertisement

• Press [1 : **] to change the
grade display mode to "1: * * =
elevation: horizontal distance".
• It is also possible to perform setting-out line measurement by pressing [S-O
LINE] when allocated to the OBS mode screen.
Allocating [S-O LINE]: "33.3 Allocating Key Functions".

16.2 Setting-out Line Point

Setting-out line point measurement can be used to find the required point
coordinate by inputting the length and offset based on the baseline.
• Before performing setting-out line point, the baseline must be defined.
1st Pt.
PROCEDURE
1. Select "Point" in <Set-out line>
2. Set the following items.
(1) Incr: Increment by which line
length and offset can be
decreased/increased using
the arrow softkeys.
Y direction
X direction
Length
Offset
Required point
Baseline
S e t - o u t l i n e
P o i n t
L i n e
S e t - o u t l i n e
I n c r
L i n e
O f f s e t
OFFSET
101
16. SETTING-OUT LINE
2nd Pt.
1 . 0 0 0 m
0 . 0 0 0
m
0 . 0 0 0 m
OK

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-65

Table of Contents