25. ROUTE SURVEYING

This mode allows a variety of route surveying options widely used in civil
engineering measurement. Each menu allows the operator to initiate a string of
successive configuration/calculation/record/setting-out operations.
• The orientation of the instrument station and backsight station can be set as
necessary.
For backsight station settings, see"13.1 Entering Instrument Station
Data and Azimuth Angle".
• EDM settings can be set in the Route Surveying menu.
"33.2 EDM Settings"
• The point names and codes set when measurement results were recorded can
only be used in the Route Surveying menu.
• The Z-axis coordinate value in all Route Surveying work is always "Null" ("Null"
is not the same as "0").
Symbols and terms used in Route Surveying
KA1
BP
BP Point:
route origin
KA Point:
clothoid curve origin
BC Point:
circular curve origin
IP Point:
point of intersection
Offset:
reference point
follow-up distance

25.1 Instrument Station Settings

The instrument station to be used as the reference point is recorded, as
necessary, prior to starting surveying.
For instrument station settings, see"13.1 Entering Instrument Station Data
and Azimuth Angle"
KE2
KE1
KA2
BC
Curve 1
EP Point: route end-point
KE Point: clothoid end-point
EC Point: circular curve end-point
SP Point: circular curve midpoint
Follow-up distance: target point
follow-up distance