Point To Line Measurement - Sokkia CX-62 Operator's Manual

Table of Contents

Advertisement

27. POINT TO LINE MEASUREMENT

Point to line allows an operator to define the coordinates of the target point when
a line connecting the base point A (0, 0, 0) and the point B is set as the X axis.
The instrument's station coordinates and angle for an unknown point C is set by
observing the point A and the point B.
Prism P1
Target height
A(0, 0, 0)
E
Instruments
height
PROCEDURE Setting Baseline
1. Press [Menu] on the second page
of the OBS mode and select "Pt to
line".
2. Select "Define baseline".
3. Enter an instrument height and
press [OK].
Z
n
Instruments Point (Unkown point)
C
206
P(n, e, z)
z
Prism P2
e
B
REM
Area calc.
S-O Line
S-O Arc
P-Project
PT to Line
Point to line
Define baseline
Point to line
Height
HI
Line
N
1.500
m
OK

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-65

Table of Contents