Point Projection - Sokkia CX-62 Operator's Manual

Table of Contents

Advertisement

• It is also possible to perform point projection measurement by pressing
[P-PROJ] when allocated to the OBS mode screen.
Allocating the function key: "33.3 Allocating Key Functions"

18.2 Point Projection

Before performing point projection, the baseline must be defined.
PROCEDURE
1. Define the baseline.
"18.1 Defining Baseline"
2. Select "Point Projection" in <Point
Projection>.
3. Enter the point coordinate.
• Press [MEAS] to observe the
point to project.
• The tilt screen is displayed if the
instrument is out of level.
Level the instrument.
"7.2 Levelling"
• Press [REC] to record the data
as a known point.
Recording method:
"30.1 Registering/Deleting
Known Point Data"
18. POINT PROJECTION
Point projection
Stn. Orien.
Define baseline
Point projection
P o i n t p r o j e c t i o n
N p :
E p :
Z p :
LOAD
REC
119
1 0 3 . 5 1 4
1 0 1 . 4 2 3
1 2 . 1 5 2
MEAS
OK
C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-65

Table of Contents