Sokkia CX-62 Operator's Manual page 128

Table of Contents

Advertisement

4. Press [OK] on the screen of step
3.
The following items are calculated
and displayed.
• Length: Distance along the
baseline from the first point to
the projected point (X direction).
• Offset: Distance from point to
project to the position at which a
line extending from point of
project intersects the baseline at
right angles. (Y direction).
• d.Elev: Elevation between the
baseline and the projected point.
• Press [XYZ] to switch the screen
display to coordinate values.
• Press [OFFSET] to switch the
screen display to distance
values.
• Press [REC]: records the
coordinate value as a known
point data.
Recording method:
"30.1 Registering/Deleting
Known Point Data"
• Press [S-O] to move to setting-
out measurement of the
projected point.
"15. SETTING-OUT
MEASUREMENT"
5. Press {ESC}. Continue the
measurement (repeat steps from
3).
18. POINT PROJECTION
P o i n t p r o j e c t i o n
L e n g t h
O f f s e t
d . E l e v
REC
XYZ
120
1 0 . 8 7 9 m
9 . 3 4 0 m
0 . 3 2 1 m
S-O

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-65

Table of Contents