Figure 54: Attaching The Equipment Rack Brackets (Continued) - Allied Telesis AlliedWare Plus Installation Manual

Gigabit layer 3 ethernet switches
Hide thumbs Also See for AlliedWare Plus:
Table of Contents

Advertisement

x930 Series Installation Guide for Virtual Chassis Stacking
Figure 54. Attaching the Equipment Rack Brackets (Continued)
3. Have two people hold the switch in the equipment rack while you
secure it using standard equipment rack screws (not provided). Refer
to Figure 55 on page 120.
119

Advertisement

Table of Contents
loading

Table of Contents