Figure 72: Management Workstation, Vt-Kit3 Management Cable, And Switch - Allied Telesis AlliedWare Plus Installation Manual

Gigabit layer 3 ethernet switches
Hide thumbs Also See for AlliedWare Plus:
Table of Contents

Advertisement

Figure 72. Management Workstation, VT-Kit3 Management Cable, and
This procedure explains how to start a local management session on the
switch with the management cable included with the device. For
instructions on how to start a remote management session, refer to the
x330 Series Software Reference for AlliedWare Plus Operating System.
To start a local management session using the management cable
provided with the switch, perform the following procedure:
1. Power on one of the switches by doing one of the following:
If the switch has an AC power supply, connect the AC power cord
to the power supply on the back panel and to an AC power source.
if the switch has two power supplies, you need to power on only
one of them for this procedure.
If the switch has the DC AT-PWR250-80 Power Supply, power on
the DC circuit and the On/Off switch on the power supply. (If you
have not yet wired the DC connector on the power supply, refer to
Chapter 9, "Wiring the DC Connector on the AT-PWR250-80
Power Supply" on page 137.)
2. Wait one minute for the switch to initialize its management software.
3. Connect the RJ-45 connector on the management cable to the
Console port on the front panel of the switch. Refer to Figure 73 on
page 144.
x930 Series Installation Guide for Virtual Chassis Stacking
Switch
143

Advertisement

Table of Contents
loading

Table of Contents