4. Repeat this procedure if there are other switches to be installed in an
equipment rack.
5. Do one of the following:
If you have not installed the power supplies yet, go to Chapter 4,
"Installing the Power Supplies" on page 93.
If any of the switches contain the AT-PWR250-80 DC Power
Supply, go to Chapter 9, "Wiring the DC Connector on the AT-
PWR250-80 Power Supply" on page 137.
Otherwise, go to Chapter 10, "Displaying the AlliedWare Plus
Version Number" on page 141.