Figure 27: Attaching The Rack-Mount Brackets To The Switch (Continued); Figure 28: Mounting The Switch In An Equipment Rack - Allied Telesis AT-GS950/28PS Installation Manual

Gigabit ethernet poe+ switches
Hide thumbs Also See for AT-GS950/28PS:
Table of Contents

Advertisement

Chapter 2: Installation
52
Figure 27. Attaching the Rack-Mount Brackets to the Switch (Continued)
3. Mount the switch in a standard 19-inch equipment rack using four
equipment rack screws (not provided with the switch).
Figure 28. Mounting the Switch in an Equipment Rack
4. Go to "Installing Optional SFP Transceivers" on page 56 or "Cabling
the Switch" on page 59.

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs950/48psAt-gs950/16psAt-gs950/10ps

Table of Contents