Allied Telesis AlliedWare Plus Installation Manual page 164

Gigabit layer 3 ethernet switches
Hide thumbs Also See for AlliedWare Plus:
Table of Contents

Advertisement

Chapter 12: Building the Stack with AT-StackQS Cards
164
Note
Refer to "Power Specifications" on page 207 for the power
specifications of the switches.
To have the switches assign the ID numbers automatically, perform the
following procedure:
1. Power on all the x930 Switches of the stack simultaneously:
For switches with AC power supplies, connect the AC power cords
to the power supplies on the back panels and to AC power
sources.
For switches with DC AT-PWR250-80 Power Supplies, power on
the DC circuits and the On/Off switches on the power supply. (For
wiring instructions, refer to Chapter 9, "Wiring the DC Connector
on the AT-PWR250-80 Power Supply" on page 137.)
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.  E3
2. Wait three minutes for the x930 Switches to select the master switch
and for the master switch to assign ID numbers to the member
switches.
The stack is now operational. The switches retain their ID numbers
when reset or powered off.
3. To continue with the installation, go to "Verifying the Stack and
Assigning Priority Numbers" on page 156.

Advertisement

Table of Contents
loading

Table of Contents