Figure 40: Tightening The Captive Screws On The Blank Panel For The Power Supply Slot - Allied Telesis AlliedWare Plus Installation Manual

Gigabit layer 3 ethernet switches
Hide thumbs Also See for AlliedWare Plus:
Table of Contents

Advertisement

Figure 40. Tightening the Captive Screws on the Blank Panel for the
3. Do one of the following:
To install an optional module, refer to Chapter 5, "Installing AT-
StackQS and AT-x9EM/XT4 Cards" on page 103.
To install the switch on a table, go to Chapter 6, "Installing the
Switch on a Table" on page 113.
To install the switch in an equipment rack, refer to Chapter 7,
"Installing the Switch in an Equipment Rack" on page 115.
To install the switch on a wall, refer to Chapter 8, "Installing the
Switch on a Wall" on page 121.
x930 Series Installation Guide for Virtual Chassis Stacking
Power Supply Slot
101

Advertisement

Table of Contents
loading

Table of Contents