Installation Tools And Accessories; Pre-Installation Checklist - H3C MSR3610-I Series Installation Manual

Ict converged gateway
Hide thumbs Also See for MSR3610-I Series:
Table of Contents

Advertisement

A minimum clearance of 0.8 m (2.62 ft) is reserved between the rack and walls or other devices
for heat dissipation and maintenance.
The headroom in the equipment room is not less than 3 m (9.84 ft).

Installation tools and accessories

Figure1-2 Installation tools
Flat-head
screwdriver
EDS wrist strap
Figure1-3 Installation accessories
Mounting brackets
(including M4 screws)
Console cable
Power cord retainer clip

Pre-installation checklist

Table1-4 Pre-installation checklist
Item
Installation
site
Phillips
screwdriver
Network cable tester
Drive carrier
Power cord
Drive fastening screw
Requirements
Ventilation
Needle-nose
Wire stripper
pliers
Heat gun
Multimeter
Grounding cable
M6 screw (user supplied)
PoE adapter (supported only by
MSR3610-I-IG/3610-IE-IG)
A minimum clearance of 100 mm (3.9 in) is reserved
around the chassis.
The installation site has a good ventilation system.
5
Diagonal pliers
Marker
Rubber feet
Result

Advertisement

Table of Contents
loading

Table of Contents